FacebookLinkedInCareersNYSE RES

Case studies

Everything you need to know about Thru Tubing. Check out our case studies below to see just how we operate.

Abrasive Cutting

TTS’ Abrasive Technology Facilitates the Completion of a Well

Thru Tubing Solutions Perforating and Abrasive Cutting Systems Facilitate the Completion of a Well Utilizing Stuck Drill Pipe.

View PDF

Abrasive Cutting System Performs Cut on Damaged 5.50″ OD Casing

Thru Tubing Solutions’ Abrasive Cutting System Performs Cut on Damaged 5.50″ OD Casing, Creating a Cost Effective Solution to a Normally Very Costly Dilemma.

View PDF

Abrasive Cutting System is deployed on 2-3/8″ CS Hydril Pipe to cut 18″ Casing

Thru Tubing Solutions’ Abrasive Cutting System is deployed on 2-3/8″ CS Hydril Pipe to cut 18.00″ Casing.

View PDF

Abrasive Cutting Jobs – Australia

Thru Tubing Solutions’ Abrasive Cutting System successfully cut 5 7/8″ Drill Pipe and provided an alternative to chemical cutters.

View PDF

Abrasively Cut 4 3/4″ Collar on Stuck Drilling Rig

Thru Tubing Solutions’ Abrasive Cutting System Successfully Cuts 4 3/4″ Collar on Stuck Drilling Rig and Saves Customer Fishing Costs.

View PDF

Zipp System

43 Stages Completed with 1 BHA

Thru Tubing Solutions ZIPP System perforated and fraced 43 stages using 1 BHA.

View PDF

5 Stages Completed in 10 Hours

Thru Tubing Solutions ZIPP System perforated and fraced 5 stages in 10 hours.

View PDF

57 Stages Completed with 1 BHA

Thru Tubing Solutions ZIPP System perforated and frac 57 stages utilizing 1 BHA.

View PDF

40 Stages Completed with 2 BHAs

Thru Tubing Solutions ZIPP System perforated and fraced 40 stages utilizing 2 BHAs.

View PDF

TTS PDC BIT

TTS PDC Bit Milled 59 Plugs in a Single Run

Thru Tubing Solutions’ PDC Bit successfully milled 59 plugs in a single run.

View PDF

Phase Separator

Maintained Motor Integrity while Pumping N2

Thru Tubing Solutions’ Phase Separator helped maintain motor integrity while pumping N2.

View PDF

Fishing Operations

TTS Successfully Retrieves Bailer BHA for Offshore Operation

TTS’ HydraSet Jar was utilized to retrieve bailer assembly for Offshore Operation.

View PDF

All Metal Motor

MetalMax: Exceptional Durability: 4.5 Days of Non-Stop Pumping

In a 13-day continuous operation, the team removed over 19,000 ft of cement while pumping continuously for 4.5 days on one MetalMax BHA.

View PDF

Horseshoe Well Drillout

Extended-Reach Horseshoe Well Drillout in the Permian Basin

View PDF

Frac Port Milling with Cardium Crude Oil

Thru Tubing Solutions’ All Metal Motor thrived while milling with Cardium Crude Oil.

View PDF

Only Well Completed in Single Run; 9 Well Pad

Thru Tubing Solutions’ All Metal Motor was the only motor to successfully complete a well in a single run on a 9 well pad.

View PDF

Milling Cement with Recycled Fluid

TTS Successfully Mills through Cement with All Metal Motor.

View PDF

Metal Motor Excels in Extreme Conditions

Thru Tubing Solutions’ All Metal Motor Excels in Extreme Conditions.

View PDF

All Metal Motor Removes Scale from Geothermal Well

TTS’ All Metal Motor removes scale from geothermal well.

View PDF

All Metal Motor endures 100+ hours of diesel

TTS’ All Metal Motor endures 100+ hours in diesel.

View PDF

All Metal Motor Outperforms Competitors in Plug Drill Out

TTS 3.13″ OD All Metal Motor Outperforms Competitors in Plug Drill Out.

View PDF

All Metal Motor Excels with Recirculated Fluid

TTS’ All Metal Motor excels in well using recirculated fluid.

View PDF

Innovative Solutions

TTS Designed Hydraulic Shifting Tool for Offshore Operation

Thru Tubing Solutions’ Designed Hydraulic Shifting Tool for Offshore Operation.

View PDF

High Velocity, High Tensile Acid Wash Run

Thru Tubing Solutions’ customized a specific dimple connector and installation tool for Offshore Operation.

View PDF

Abrasive Perforating System

Abrasive Perforating System Equalizes Annular Pressure

Thru Tubing Solutions’ Abrasive Perforating System equalizes annular pressure.

View PDF

Abrasive Perforating System sets 72 Stage Record

Thru Tubing Solutions successfully completed a 72 stage Abrasive Perforating job.

View PDF

Slim-Hole Abrasive Perforating after Toe Sleeve Failure

Thru Tubing Solutions was able to successfully perforate abrasively after toe sleeve failure.

View PDF

Abrasive Perforating Test thru Multiple Strings

Thru Tubing Solutions successfully completed an abrasive perforating test through multiple strings.

View PDF

Perforating thru 4 strings of casing

Thru Tubing Solutions successfully perforated through 4 strings of casing.

View PDF

Extended Reach Applications

XRV Outperformed a Competitor’s Tool

Thru Tubing Solutions’ Extended Reach Vibratory Tool outperformed a competitor’s tool.

View PDF

XRV Surpassed Predicted Lock-up Depth to Reach TD

Thru Tubing Solutions’ Extended Reach Vibratory Tool surpassed predicted lock-up depth and allowed the customer to tag TD.

View PDF

XRV Reached New Record Depth in the Bakken

Thru Tubing Solutions’ XRV Reached NEW Record Depth in the Bakken.

View PDF

XRV G3 Reached TD with Positive WOB

XRV G3 Reached TD with Positive WOB

View PDF

XRV G3 Helps Milling Operation Average 5 mmp

XRV G3 Helps Milling Operation Average 5 min per plug in 10,200′ lateral

View PDF

XRV G3 Reached Record Depth in Canada

Thru Tubing Solutions’ XRV G3 reached record depth in Canada.

View PDF

WavForce XRV Breaks Two Canadian CT Depth Records on Same Pad

WavForce XRV breaks Canadian coiled tubing depth record.

View PDF

WavForce XRV Exceeds Predicted Lockup

2.88″ WavForce XRV surpassed predicted lockup for a successful operation.

View PDF

WavForce XRV combines with Abrasive Perforator for a One-Trip Solution

TTS’s WavForce XRV combines with Abrasive Perforator for a one-trip solution.

View PDF

Milling Operations

Improved Milling Results with F5 Motor

TTS’ F5 Motor improved milling results for a customer in Canada.

View PDF

Insert Step Mill is Used to Mill Chrome Parking Sub

TTS uses an insert step mill to mill out a failed parking sub to complete the job successfully.

View PDF

TTS’ Milling Assembly Milled up a 5.5″ FIV Valve.

Thru Tubing Solutions’ Milling Assembly Milled up a 5.5″ FIV Valve in Offshore Congo.

View PDF

TTS Milling Assembly sets multiple records in the Permian Basin.

TTS’ Milling Assembly sets multiple records in the Permian Basin.

View PDF

Optimized 6BPM F5 Motor Completes Record Operation

F5 Motor mills through 141 plugs in a single run.

View PDF

F5 Motor Completes a Record Breaking 4.5 Mile Lateral

TTS completed the longest well in the United States in the Utica formation.

View PDF

Abrasive Release Connector

Abrasive Release Connector Saves Operator CT Costs

Abrasive Release Connector saves operator 20,801′ of coiled tubing.

View PDF

TCP Motor Cleanout System

TCP Motor Cleanout System Established Toe Injection

TCP Motor Cleanout System established injection after a toe-port failure.

View PDF

TCP Motor Cleanout System Saves Operator Time on Location

TCP Motor Cleanout System saves operator 48 hours of rig time.

View PDF

TCP Motor Cleanout System Established Injection Rate Utilizing the WavForce XRV

TCP Motor Cleanout System and WavForce XRV combine to establish injection rate in a 15,024′ lateral.

View PDF

TCP Motor Cleanout System Reaches TD in Well Depth Record

TCP Motor Cleanout System provides one-trip solution for Oklahoma operator.

View PDF

TCP Motor Cleanout System Establishes Injection Rate After Wet Shoe Lock-Up

TCP Motor System and WavForce XRV complete challenging intervention in 13 hours.

View PDF